Client:
African Energy Supplier
Market:
Energy Utilities
Project:
Supplementing the grid for 18 months ensuring no homes or industries were without power in the local region.
Problem:
Local grid could not cope with peaks in demand and power to the region was vulnerable to political upheaval. The site was in a remote location with extreme temperatures.
Package:
In excess of 30MW of generation with all ancillary items (including transformers, cables and fuel tanks with four days of fuel autonomy).
Technical Solution:
Carried out a full site survey and presented the client with a cost and fuel efficient bespoke solution; we then worked with the client to project manage the set-up from design and delivery to site, through to full installation.