ESE installs two 1675KVA generators in under 2 mins!
https://youtu.be/lqG72PFUj2E
We have updated our projects section with 2 recent case studies:
Our client is awaiting a supply upgrade from the Utility Company and in the interim has a requirement for additional power due to the installation of a new classified recycling unit. The additional power requirement is approx. 300kW. In addition, the existing grid supply is not sufficient and the classifier generates a lot of harmonics.
The client had a requirement to carry out due diligence at all their sites in the UK to assess whether their fuel storage installations meet the requirements of the Oil Storage Regulations. The sites being assessed were all remote, using different tanks/generators of varying ages and constructions. A knowledge of the Regulations past/present and geographical regulatory differences was required and the client did not have this resource in-house.